Nose redesign trash collector
The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector.
The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector.
Saltwater was contracted to assist with various engineering scopes to mobilize the Boka Constructor.
Saltwater was contracted by Stena Line to perform the lightweight check for the Stena Britannica.
Designing a ballast water treatment system onboard the Prins der Nederlanden and Oranje.
To better serve customers, we have been looking for a general solution that improves the applicability and integration of a LARS.
Sarens contracted Saltwater to calculate the actual capacity of a ballast system to account for possible flow/pressure losses.
The system can be disassembled and placed inside 40-foot containers, allowing the structure to be transported across the globe.
Saltwater Engineering B.V. was contracted by Boskalis to implement several design alterations to an existing injector foot.
Exchanging lock doors at the Volkeraksluizen to keep them running smoothly.
Calculating stability and mooring of a 19 meter high rotating disc shaped stage set in the turquoise waters of Hatta Dam.