Preparing the Isle of Jura for Fehmarnbelt dive support operations
Saltwater engineered a way to fit a 170-tonne dive spread on a vessel with limited deck space and deadweight.
Saltwater engineered a way to fit a 170-tonne dive spread on a vessel with limited deck space and deadweight.
To meet the needs of the Fehmarnbelt tunnel project, Saltwater engineered Helen for complex maintenance operations.
Saltwater provided basic design, project management, and documentation for Damen Maaskant’s new fishing vessel.
Inclination test confirms post-upgrade stability, ensuring compliance and readiness for offshore geotechnical research operations.
Learn what a lightweight survey is, when it is required, and how it ensures accurate vessel stability and compliance.
Saltwater provides on-site support at the Fehmarnbelt tunnel, a long-term project in Denmark.
Saltwater was contracted by Stena Line to perform the lightweight survey for the Stena Britannica.
Designing a ballast water treatment system onboard the Prins der Nederlanden and Oranje.
To better serve customers, we have been looking for a general solution that improves the applicability and integration of a LARS.
Saltwater Engineering B.V. was contracted by Boskalis to implement several design alterations to an existing injector foot.