Skip to content
Saltwater
Custom engineering solutions for the naval and offshore industry
Saltwater
  • Services
    • Ship Design & Conversion
      • Concept designCustom newbuild design and vessel conversions
      • Basic engineeringFrom concept to a construction-ready design
      • Detailed engineeringComplete build-ready engineering package
      • System integrationsSeamless vessel systems intergration expertise
      • Sustainability studiesSustainable maritime solutions
    • Maritime Engineering
      • Deck integrationsSeamless integration of deck equipment
      • Vessel mobilizationsTailored engineering for vessel mobilizations
      • Heavy lift & transportTransport engineering ensuring cargo safety
      • Marine operationsEngineering software optimizes marine operations
      • Equipment designDesigned for demanding environments
    • On-site Services
      • Weight & stability surveysPerforming surveys guarantees ship safety
      • Specialist surveysSpecialist inspections secure fleet performance
      • On-site engineering supportScalable engineering support solutions
      • Interface engineering supportSenior naval engineering support
  • R&D
    • Prototypes
      • Blue SkyService Operation Vessel for floating offshore wind
      • Blue QuestVersatile offshore survey vessel
      • Blue DawnMid-size SOV for floating offshore wind
    • Whitepapers
      • Market Outlook Ship ConversionWhy ship conversion is the smart alternative to newbuilds
      • BWTSBallast Water Treatment Systems explained
      • OverviewView all whitepapers
    • Events & Sessions
      • 3D scanning in the maritime sectorOn-demand expert panel session
  • About us
  • Careers
  • News
  • Contact
  • NL
  • Services
    • Ship Design & Conversion
      • Concept designCustom newbuild design and vessel conversions
      • Basic engineeringFrom concept to a construction-ready design
      • Detailed engineeringComplete build-ready engineering package
      • System integrationsSeamless vessel systems intergration expertise
      • Sustainability studiesSustainable maritime solutions
    • Maritime Engineering
      • Deck integrationsSeamless integration of deck equipment
      • Vessel mobilizationsTailored engineering for vessel mobilizations
      • Heavy lift & transportTransport engineering ensuring cargo safety
      • Marine operationsEngineering software optimizes marine operations
      • Equipment designDesigned for demanding environments
    • On-site Services
      • Weight & stability surveysPerforming surveys guarantees ship safety
      • Specialist surveysSpecialist inspections secure fleet performance
      • On-site engineering supportScalable engineering support solutions
      • Interface engineering supportSenior naval engineering support
  • R&D
    • Prototypes
      • Blue SkyService Operation Vessel for floating offshore wind
      • Blue QuestVersatile offshore survey vessel
      • Blue DawnMid-size SOV for floating offshore wind
    • Whitepapers
      • Market Outlook Ship ConversionWhy ship conversion is the smart alternative to newbuilds
      • BWTSBallast Water Treatment Systems explained
      • OverviewView all whitepapers
    • Events & Sessions
      • 3D scanning in the maritime sectorOn-demand expert panel session
  • About us
  • Careers
  • News
  • Contact

Propellor shaft beneath the Aurora-G

Propellor shaft reinforcement

Projects, Vessel DesignBy Anninka VermeijMarch 14, 2023

Saltwater has been contracted to research propellor shaft problems. An inspection revealed problems with the propeller shafts.

filtration unit

Feasibility study

Vessel DesignBy Anninka VermeijFebruary 20, 2023

Saltwater performed a feasibility study into IMO Tier III compliance for a dated vessel.

Modeling of quaysides, vessels and mooring lines

Mooring analysis

Projects, Transport EngineeringBy Anninka VermeijFebruary 20, 2023

Saltwater was contracted to assist with the verification of the mooring lay-out for several vessels.

The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector named the Interceptor 004.

Nose redesign trash collector

Projects, Vessel DesignBy Anninka VermeijJanuary 24, 2023

The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector.

Saltwater was contracted to assist with various engineering scopes to mobilize the Boka Constructor.

Boka Constructor mobilization

Mobilization Engineering, ProjectsBy Anninka VermeijDecember 20, 2022

Saltwater was contracted to assist with various engineering scopes to mobilize the Boka Constructor.

Saltwater Engineering was contracted by Stena Line to perform the lightweight check for the Stena Britannica.

Five-Year survey Stena Britannica

On-site services, ProjectsBy Anninka VermeijNovember 21, 2022

Saltwater was contracted by Stena Line to perform the lightweight survey for the Stena Britannica.

Saltwater Engineering was contracted by Boskalis to provide a design for a Ballast Water Treatment System onboard of the Prins Der Nederlanden and the Oranje

Double BWTS design

On-site services, ProjectsBy Anninka VermeijSeptember 5, 2022

Designing a ballast water treatment system onboard the Prins der Nederlanden and Oranje.

To better serve customers, Saltwater has been looking for a general solution that improves the applicability and integration of a LARS.

Redesign of a LARS

On-site services, ProjectsBy Anninka VermeijAugust 8, 2022

To better serve customers, we have been looking for a general solution that improves the applicability and integration of a LARS.

Sarens contracted Saltwater to calculate the actual capacity of a ballast system to account for possible flow/pressure losses due to the system layout.

Pump capacity calculations

Mobilization Engineering, ProjectsBy Anninka VermeijMay 12, 2022

Sarens contracted Saltwater to calculate the actual capacity of a ballast system to account for possible flow/pressure losses.

Insufficient load capacity of your maindeck hatchcovers? We can help.

Hatchcover strengthening

Projects, Transport EngineeringBy Anninka VermeijApril 21, 2022

The system can be disassembled and placed inside 40-foot containers, allowing the structure to be transported across the globe.

←123456…
78
9→
Produced by DG Internetbureau | All rights reserved
Go to Top

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in .

Salwater logo
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Cookie Policy

More information about our Cookie Policy