Hatchcover strengthening
The system can be disassembled and placed inside 40-foot containers, allowing the structure to be transported across the globe.
The system can be disassembled and placed inside 40-foot containers, allowing the structure to be transported across the globe.
Saltwater Engineering B.V. was contracted by Boskalis to implement several design alterations to an existing injector foot.
Exchanging lock doors at the Volkeraksluizen to keep them running smoothly.
Calculating stability and mooring of a 19 meter high rotating disc shaped stage set in the turquoise waters of Hatta Dam.
Saltwater prepared this old lightship for a new purpose.
Designing the foundation for a rescue boat and davit with launching equipment for Zr. Ms. Luymes.
Engineering the conversion and placement of a ballast water treatment system.
Saltwater was contracted to deliver detailed engineering for the repair works of a container vessel.
Saltwater was contracted to perform the lightweight check for two vessels.
Sea fastening of a 260t heavy excavator crane