Nose redesign trash collector
The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector.
The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector.
Engineering the conversion and placement of a ballast water treatment system.
Saltwater was contracted to deliver detailed engineering for the repair works of a container vessel.
Saltwater was awarded the complete engineering package for a new aftship.
Saltwater developed a new concept for an “Operations & Maintenance” vessel.
Stability calculations for the heavy lifting crane vessel, The Oleg Strashnov.
Saltwater was contracted to generate the structural design of the hull.
The request to develop (from scratch) a fully customized yacht for inland waters.
Saltwater delivered a detailed engineering package for a 24m yacht
Saltwater carried out design and stability calculations for the various stages of design of the Floater.