Cable layer conversion
Saltwater performed a feasibility check on a proposal to convert the PSV Skandi Sotra to a cable laying vessel.
Saltwater performed a feasibility check on a proposal to convert the PSV Skandi Sotra to a cable laying vessel.
Saltwater was contracted by Amels to generate the structural design of a Yacht LE199.
Saltwater was contracted to execute a special survey to inspect damage on a floating dry dock.
Saltwater was contacted to assist onboard a safety stand-by vessel, which had various cracks appear at multiple locations.
Saltwater has been contracted to research propellor shaft problems. An inspection revealed problems with the propeller shafts.
Saltwater performed a feasibility study into IMO Tier III compliance for a dated vessel.
Saltwater was contracted to assist with the verification of the mooring lay-out for several vessels.
The Ocean Cleanup awarded Saltwater the contract for the redesign of the front (nose) of a trash collector.
Saltwater was contracted to assist with various engineering scopes to mobilize the Boka Constructor.
Saltwater was contracted by Stena Line to perform the lightweight check for the Stena Britannica.