Saltwater performed a feasibility check to convert the Skandi Sotra to a cable laying vessel to connect the world.
Saltwater performed a feasibility check to convert the Skandi Sotra to a cable laying vessel to connect the world.
Five caissons which have been used to moor a spare lock gate needed to be removed and transported.
Saltwater was contracted for a preliminary design for chase vessels.
Saltwater performed a feasibility check on a proposal to convert the PSV Skandi Sotra to a cable laying vessel.
Saltwater was contracted by Amels to generate the structural design of a Yacht LE199.
Saltwater was contracted to execute a special survey to inspect damage on a floating dry dock.
Saltwater was contacted to assist onboard a safety stand-by vessel, which had various cracks appear at multiple locations.
Saltwater has been contracted to research propellor shaft problems. An inspection revealed problems with the propeller shafts.
Saltwater performed a feasibility study into IMO Tier III compliance for a dated vessel.
Saltwater was contracted to assist with the verification of the mooring lay-out for several vessels.