Propulsion overhaul
Saltwater was commissioned to carry out the basic engineering for the conversion of two geotechnical survey vessels.
Saltwater was commissioned to carry out the basic engineering for the conversion of two geotechnical survey vessels.
Blue Dawn is a 60 meter mid-sized SOV designed to meet the growing demand in the offshore renewable market.
Saltwater performed a feasibility check to convert the Skandi Sotra to a cable laying vessel to connect the world.
Saltwater was contracted for a preliminary design for chase vessels.
Saltwater performed a feasibility check on a proposal to convert the PSV Skandi Sotra to a cable laying vessel.
Saltwater was contracted by Amels to generate the structural design of a Yacht LE199.
Saltwater was contracted to execute a special survey to inspect damage on a floating dry dock.
Saltwater was contacted to assist onboard a safety stand-by vessel, which had various cracks appear at multiple locations.
Saltwater has been contracted to research propellor shaft problems. An inspection revealed problems with the propeller shafts.
Saltwater performed a feasibility study into IMO Tier III compliance for a dated vessel.