left-small-gray-img

Our field of expertise

Winch and LARS foundation

Saltwater was contracted by Fugro for the engineering support for the mobilisation of the Gargano. The A-frame is to be placed onboard the Gargano for final SAT testing. The challenge is to complete the engineering from blank page to production drawings in just three days.

 

Foundation
For the foundation of the A-frame, parts of the FAT tested frame are to be used to speed up production. The winch is an existing unit but requires a whole new foundation.

 

Gargano
The Gargano is a 72m dynamically positioned supply vessel with an aft cargo deck extending to 640m2. The vessel is built in 2002 and since 2009 in several geotechnical investigation projects.

Winch and LARS foundation
left-gray-bg

Specific project data

Project information

Scope of work:

  • FEM calculations to determine the structural integrity of the winch foundation
  • FEM calculations to determine the structural integrity of the A-frame foundation
  • FEM calculations to determine the structural integrity of the deck
  • Weld calculations
Winch and LARS foundation
Winch and LARS foundation
Winch and LARS foundation
Winch and LARS foundation
Winch and LARS foundation
Winch and LARS foundation
1960-SMS-Despina-Winchframe
1960-SMS-Despina-Winchframe
1960-SMS-Despina-Winchframe

Are you facing a challenge?

Get in touch with one of our consultants

Contact