Bridge transport

Saltwater Engineering was contracted to perform load out assessments, stability calculations and a mooring analysis for the transport and load out of various bridge parts from two different building locations to her final resting position in Utrecht. The works involved a variety of specialisms such as the usage of specialist software for stability and mooring arrangements. The tidal difference of the quaysides combined with the availability of limited fleet material from the client resulted in a “narrow” fit as can be seen in the project pictures.

Project

_mg_3686-2

PROJECT INFORMATION

Scope of work:

– load out calculations

– load out sequence arrangements

– stability calculations

– mooring analysis

 

Dimensions:

Dimensions bridge parts:

Length: approx. 55,0m

Breadth: 11.2m

Weight: +600 tons

_mg_3677
_mg_3678
_mg_3699
Category
Transport Engineering