Over the past 20 years, Saltwater has built partnerships that go far beyond individual projects. Our relationship with Fugro is a great example. What started with occasional engineering requests has grown into a long-standing collaboration involving numerous projects, both large and small.

 

To celebrate our 20th anniversary, Bas sat down with Floris and Michel from Fugro to look back on their years of working together. They reflected on projects that evolved to meet operational needs, solutions that found new applications on different vessels, and mobilizations where a Friday afternoon phone call sometimes meant getting started the following Monday.

 

But above all, they talked about what makes working together easier and more effective after so many years.

How long have you known Saltwater Engineering, and how did the relationship begin?

It goes back quite a while, so we can’t remember exactly when it all started. Around 2008, we were already coming across engineering work done by Saltwater, although we didn’t realize at the time that Saltwater was behind some of those calculations.

 

It wasn’t until later, during conversations with Bas and Sander, that we discovered you had already worked on several of our earlier projects. That’s when we established direct contact, sometime around 2009 or 2010.

 

Since then, we’ve worked together on a wide range of projects. If we count everything, both large and small, we’re probably approaching 100 projects. Some were relatively straightforward engineering requests, while others lasted for months.

“Our partnership actually started earlier than we realized.”

How has the partnership evolved over the years? What makes working together so successful?

In the early days, it was mainly smaller engineering assignments and individual vessel mobilizations. Over time, the number of projects increased, and so did their size and complexity.

 

What really defines our partnership is how quickly we can respond and adapt together. Our projects are highly dynamic. A vessel might change during the preparation phase, or a mobilization might suddenly need to happen much sooner than expected. In those situations, it makes a real difference to work with a team that can adapt just as quickly.

“Sometimes it’s a Friday afternoon call: ‘Bas, are you available Monday?’ And by Monday, we’re getting started.”

After all these years, we know each other well. We don’t have to start from scratch with every new project. Sometimes, simply mentioning a system or project name is enough for everyone to understand what’s needed and who should be involved. That familiarity makes it easy to get things moving.

Is there a particular project or collaboration that stands out?

It’s hard to choose after so many projects, but the moonpool system on the Larissa is definitely one that comes to mind.

 

It started with a frame designed to make onboard operations safer. As the system was put into use, new operational requirements emerged, and the design continued to evolve. Additional features were introduced, including a platform that allowed crew members to work safely at height. Eventually, the design could also be adapted for use on other vessels and moonpools.

 

What made the solution particularly valuable was its modular design. When one vessel was no longer available, the system could be transferred to another and modified to fit. This saved time and engineering effort while allowing a proven solution to be used again and again.

 

Another memorable project was Blue Dragon. This involved a larger installation with a wide range of equipment and interfaces, requiring careful coordination between different engineering disciplines and onboard systems.

 

The most rewarding part is seeing a design perform exactly as intended in real-life operations. The crew was particularly pleased with how accessible and easy to use the installation was.

Do you have a favorite memory or anecdote from working with Saltwater?

That would have to be the chocolate letters.

 

During one mobilization, we discovered that a bolt-hole pattern wasn’t positioned correctly, meaning dozens of holes had to be redrilled. Naturally, that wasn’t ideal. But rather than spending too much time discussing what had gone wrong, we focused on finding a solution together as quickly as possible. And we did.

 

Every year around Sinterklaas, a Dutch holiday celebrated in early December, Saltwater sends its clients and business relations two chocolate letters: S and E, for Saltwater Engineering.

 

After that particular mobilization, we thought the team deserved a little something extra. So we tracked down all the missing chocolate letters and, instead of just S and E, presented them with the company’s full name: SALTWATER ENGINEERING.

 

Looking back, it’s a great memory. Things don’t always go exactly as planned during a project, but you work together to solve the problem. And afterward, you can have a good laugh about it.

“It’s great knowing you can simply pick up the phone, ask ‘Do you have time?’ and trust that everything will work out.”

Looking back on your partnership, what are you most proud of achieving together?

Above all, we’re proud that so many of the solutions we’ve developed together have gone beyond a single project. Designs have been adapted, improved, and reused. After all, there’s no need to reinvent a good solution every time.

 

Our expertise also complements each other really well. We know our own equipment, operations, and systems inside out. Saltwater brings specialist knowledge of vessel structures and how our equipment interfaces with the ship. Those are different areas of expertise, and that’s exactly why the combination works so well.

 

After so many years, there’s also a strong foundation of mutual trust. When something needs to happen quickly, we can get straight to work, knowing that both sides will take care of what’s needed.

Featured project

Moonpool Frame Modification

Saltwater engineered the modification of an existing moonpool frame onboard Fugro’s MV Despina to accommodate a larger ROV. The modular design enables efficient transportation, assembly and installation, while structural calculations ensure safe integration and minimize valuable time spent in harbor.