Umbilical Saddle

For a major subsea operator we were asked to engineer an umbilical saddle. The saddle was to act as a support for the umbilical and secondary equipment as well as a mass to allow for proper usage of the crane. Besides the engineering, Saltwater was also contracted to fabricate the saddle.

Project

PROJECT INFORMATION

Challenge:

  • Extreme short timeframe

Task:

  • Design and delivery of the equipment

Deliverables:

  • MWS approval package including product information
Category
Mobilisation Engineering